SAMPLEThis is a sample. The tool and every number in it are made up to show what a benmark report looks like.

benmarkIndependent test report

Example Tool 2.4, tested November 2026

38% faster than by hand.0 errors in 1,000 runs.

Example Tool is an AI tool for performance marketing teams. We gave it three jobs its customers do every week.

Three independent testers did the same jobs by hand, from matched briefs. A script then compared every result with the brief, line by line. Scores come from the finished work, never from what the tool says it did.

  • Commissioned byThe vendor, for a fixed fee
  • Designed, run and scored bybenmark
  • Valid to31 March 2027
The resultVERIFIED
38%faster than by hand, across three jobs
64%of work was agency quality or better
0of 1,000runs with an error, after fixes. The first 1,000 had 4.
96%of tasks passed on the best-fit model, against 91% today
benmarkTested Nov 2026How we tested

Is it better?

Three jobs. 6h 30m by hand.4h 02m with the tool.

Three independent testers did each job by hand and with the tool, on matched versions of the brief. Times are the median of the three. In your report, these are the jobs your tool does.

By hand, all three jobs6h 30m
With the tool4h 02m
Time back2h 28m
  1. Build

    A full set-up from a written brief.

    With the tool 1h 45mBy hand 3h 00m

    With the tool: 0 differences from the brief in 1,240 checks. By hand: a median of 7.

    1h 15msaved, 42% faster
  2. Change

    Bulk edits to work that is already live.

    With the tool 1h 25mBy hand 2h 10m

    With the tool: 1 difference from the brief in 860 checks. By hand: a median of 4.

    45msaved, 35% faster
  3. Report

    The weekly numbers, pulled and summarised.

    With the tool 52mBy hand 1h 20m

    With the tool: every figure matched the source. By hand: a median of 2 figures off.

    28msaved, 35% faster

Quality, scored blind

64%

of work was agency quality or better.

50 pieces from the tool were mixed with 50 made by an agency. Three reviewers scored all 100 without knowing which was which.

32 of 50 scored at or above the agency’s median.

Results, in a live A/B test

+12%

higher conversion rate.

Two versions ran side by side for 14 days, with 40,000 visitors each. The likely range for the lift is +3% to +21% (95% interval).

With the tool2.8%
Without it2.5%
Notes and limits
  • Times are medians of three testers. One tester’s by-hand run of job 2 hit the 3-hour cap and is counted at the cap, so the saving for that job is a minimum.
  • The one difference in job 2 was a name with a missing suffix. The tool did not report it.
  • The A/B test ran on one account over 14 days. It does not cover seasonal swings.

Is it reliable?

1,000 runs. 4 errors found.After fixes, 0 in 1,000.

The same job, run 1,000 times, with every output checked against the brief by script. An error is anything that differs from the brief. The vendor fixed what we found, and we ran all 1,000 again.

First 1,000 runs4 errors
After fixes, 1,000 more0 errors
26,000checks against the brief in each set of runs
4 of 4errors fixed and clean in the re-run
1 of 4errors the tool reported itself
< 0.3%true error rate, at 95% confidence

The error log

RunWhat went wrongReported by the toolAfter the fix
87A value taken from the wrong row of the briefNoClean in the re-run
311A name cut off at 40 charactersNoClean in the re-run
562A date set in the wrong time zoneYesClean in the re-run
904One step skipped when an input file was emptyNoClean in the re-run
Notes and limits
  • 0 errors in 1,000 runs is not a promise of no mistakes. It means the true error rate is very likely below 0.3%.
  • Every run used the same job with different inputs. Other jobs were not stress-tested.
  • The re-run used the version with the fixes, 2.4.1. The first 1,000 used 2.4.

Is it on the right model?

Model C passes more of your tasks, for a third less.

240 of the tool’s own tasks, run on three current models. 200 are scored by script against answer keys, and 40 are scored blind by people.

ModelTasks passedCost per 100 tasksMedian time
Model CBest fit 96% Cost per 100 tasks$4.10 Median time38s
Model AIn the tool today 91% Cost per 100 tasks$6.20 Median time41s
Model BCheapest 84% Cost per 100 tasks$1.90 Median time22s
RecommendationMove to Model C. Check again when the next major model ships.

Limits

What this test does not tell you.

What it covers

  • One version. Example Tool 2.4 and 2.4.1, as they were in November 2026. Later versions are not covered.
  • Three jobs. Chosen with the vendor before testing started. Other jobs may go differently.
  • One set-up. A test account and a made-up brand, not your own account.

Worth checking on every run

  • Read the tool’s closing report. It named one of the four errors itself.
  • Open the first result of each batch. Three of the four errors would have shown there.
  • Check names against your own convention. The one difference in job 2 was a name.

Method

How we tested.

Who paid, and for what

The vendor paid benmark a fixed fee, agreed before testing. The fee did not depend on the result. The vendor saw the results first and chose to publish them.

Who did the testing

Three independent testers. Each declared any link to the vendor before starting, and none had one.

How we scored

A script compared the finished work with the brief, line by line. Quality was scored blind by three reviewers. Nothing was scored from the tool’s own account of what it did.

What counts as an error

Anything in the finished work that differs from the brief. The rule was fixed before the first scored run.

How long this result lasts

To 31 March 2027, the end of the quarter after testing. AI tools change quickly, so older results are retired.

Want a report like this for your tool?

It starts with a 30-minute call. Afterwards you get a test plan and a fixed price.